Fibrwrap Construction Lebanon SARL

Fibrwrap Lebanon: Rehabilitation of sewer manhole, LMJ A/S in Denmark

Fibrwrap Construction

8690 Red Oak Street
Rancho Cucamonga" />
  • Rehabilitation of sewer manhole, LMJ A/S in DenmarkContact Us
  • Tyfo® Product Catalog

    Fyfe Company is ISO-certified and the manufacturer of FRP products and strengthening systems.

    Fibrwrap Customer Survey

    We value your feedback.

    Tyfo® System Pipe Animation

    Fibrwrap Construction uses the Tyfo® FRP system to rehabilitate and strengthen pipelines.

    Fibrwrap Construction

    8690 Red Oak Street
    Rancho Cucamonga" />
  • Rehabilitation of sewer manhole, LMJ A/S in DenmarkContact Us
  • Tyfo® Product Catalog

    Fyfe Company is ISO-certified and the manufacturer of FRP products and strengthening systems.

    Fibrwrap Customer Survey

    We value your feedback.

    Tyfo® System Pipe Animation

    Fibrwrap Construction uses the Tyfo® FRP system to rehabilitate and strengthen pipelines.

    Rehabilitation of sewer manhole, LMJ A/S in Denmark

    Project: Rehabilitation of a sewer manhole ø1250mm
    Location: Denmark
    Client: LMJ A/S
    Contract Duration: 2 days

    Scope of Works:
    • Rehabilitation of a sewer manhole

     

    Project Description:
    The manhole is located in a playing field and the connecting pipelines are 6m below ground. The customer preffered our solution because they will renovate the area completely and do not want any surprises in the future with their underground infrastructure. After renovation, the manhole was covered with a concrete slab. The pipelines are renovated with CIPP by LMJ A/S from Glustrup (near Kopenhagen) for which we worked as a subcontractor. The manhole showed cracks and leakages, these defects were repaired before the application of our composite solution, the Tyfo® Fibrwrap System. For this project we chose to use a Tyfo® WP epoxy primer (for damp surfaces) in combination with Tyfo® SEH-25A glassfiber and Tyfo® SW-1S epoxy. Not only is the manhole structurally upgraded with this solution, it also shields it from harmfull (bio)chemical gasses. The project took just 2 days to complete.

    Similar Projects