Fibrwrap Construction Lebanon SARL

Fibrwrap Lebanon: Rehabilitation of sewage pumping station, Almelo, The Netherlands

Fibrwrap Construction

8690 Red Oak Street
Rancho Cucamonga" />
  • Rehabilitation of sewage pumping station, Almelo, The NetherlandsContact Us
  • Tyfo® Product Catalog

    Fyfe Company is ISO-certified and the manufacturer of FRP products and strengthening systems.

    Fibrwrap Customer Survey

    We value your feedback.

    Tyfo® System Pipe Animation

    Fibrwrap Construction uses the Tyfo® FRP system to rehabilitate and strengthen pipelines.

    Fibrwrap Construction

    8690 Red Oak Street
    Rancho Cucamonga" />
  • Rehabilitation of sewage pumping station, Almelo, The NetherlandsContact Us
  • Tyfo® Product Catalog

    Fyfe Company is ISO-certified and the manufacturer of FRP products and strengthening systems.

    Fibrwrap Customer Survey

    We value your feedback.

    Tyfo® System Pipe Animation

    Fibrwrap Construction uses the Tyfo® FRP system to rehabilitate and strengthen pipelines.

    Rehabilitation of sewage pumping station, Almelo, The Netherlands

    Project: Rehabilitation of sewage pumping station Schelfhorst (ca. 170m2)
    Location: Almelo
    Client: Municipality of Almelo
    Contract Duration: 5 days

    Scope of Works:
    • Rehabilitation of a sewage pumping station

     

    Project Description:
    The sewage pumping station Schelfhorst in Almelo has been thoroughly updated. Much attention was give to the airtight sealing of the hatches and protecting the whole surface to further deterioration due to the presence of (bio)chemical gasses. Chris Borninkhof, manager of public space and sewer at the city of Almelo saw the added value in a solution providing not only (bio)chemical protection but at the same time also strenghten the concrete slabs and walls. The Tyfo® Fibrwrap System provides both in one application. We were subcontracted by Gebr. Löwik Bouw- en Betonbedrijf, who was selected as main contractor for this project. Firstly the whole surface of ca. 170m2 was thoroughly hydroblasted to remove any debris and loose particles. The applied Tyfo® Fibrwrap System consists of a Tyfo® WP epoxy primer for damp surfaces in combination with Tyfo® SEH-25A glasvezel en Tyfo® S epoxy for strength and protection. The total project took only 5 days to complete.